0. Getting Started


A. Goals

The purpose of the Travelling Salesperson1 Problem (TSP) assignment is to practice implementing interfaces, manipulating nodes and references, testing with JUnit. The specific goals are to:


B. Background

A travelling salesperson needs to visit each of n cities exactly once, and arrive back home, keeping the total distance travelled as short as possible. In this assignment, you will write a program to find a path connecting n points that passes through each point exactly once.

The travelling salesperson problem is a notoriously difficult combinatorial optimization problem. There does not exist an efficient algorithm to find the optimal tour, the tour of smallest distance. The only way to find the optimal tour is to use brute force: to compute the distance of all possible tours. The problem with this is that there are n! (n factorial) possible tours; enumerating them all and computing their distance would be very slow.

However, there are efficient ways to find a tour that is near-optimal; these methods are called heuristics. You will implement two heuristics to find good (but not optimal) solutions to the traveling salesperson problem. You will also implement a simpler method which creates a tour by traveling to points in order.

1000 points 1000 pts tour
1,000 points Optimal tour through the same 1,000 points

The travelling salesperson problem has a wealth of applications such as vehicle routing, circuit board drilling, circuit board design, robot control, X-ray crystallography, machine scheduling, and computational biology.


C. Your program

In this assignment, you will write a Tour class that models a tour using a ordered sequence of Point objects. You will also write a TourTest class that will contain JUnit tests for Tour.

You will implement the following methods to insert points into a tour.


D. Designing the Requirement and Interface

Open HW7 on Codio and look at the files provided, or you can download them here. The provided files contain files you can use for testing as well as some helper classes and interfaces you will need:

To review, look at class and recitation material on nodes, references, linked lists and JUnit.


1. TourTest Class

A. Test Driven Development

In this section we will practice test driven development. In test driven development, we will write test cases in TourTest despite knowing that our tests cases will fail since we haven’t finished Tour yet. Thinking about tests cases in TourTest before implementing Tour will force you to think what exactly the Tour class does, which will help you write better code! In addition, having a test suite ready to go will help you start debugging quickly if some of your tests cases fail.

B. Practicing Test Driven Development

Before writing any code in Tour, read section 2 - Tour Class and section 3 - Insertion Heuristics to get a better sense of what Tour will do and its utility methods. Then you should take a look at TourTest and understand what the given tests cases attempt to test. Some have been filled in for you as well. Your overall process for completing this assignment will be the following:

  1. Read the rest of this section, section 2 - Tour Class, and section 3 - Insertion Heuristics to get a good understanding of the Point, Node, and Tour classes and the different insertion heuristics you’re going to implement.
  2. Create the file Tour.java and add in method stubs for all of the methods you’ll be implementing from TourInterface.
  3. Fill in the test cases in TourTest using your understanding of the methods in Tour and remember to add a class header to TourTest as well. We encourage you to add any of your own tests cases.
  4. Implement and complete Tour, running your test cases as you go.

Note: Doing the above is a recommendation, not a requirement. If you decide not to follow the above procedure, that’s okay, but you should instead complete the homework following the order of the writeup. However, we really suggest that you to practice test driven development by following the process above.

C. Test, Test, and Test Again

Don’t be afraid to include more of your own tests. Run your tests often; running them after completing your implementation of a function or making a change is a good idea. Ideally, you should complete all the tests in TourTest, then run them whenever you finish a function in Tour.


2. Tour Class

In this section, you will write Tour, implementing TourInterface. The Tour is represented by a linked sequence of nodes. Each node contains a point which is essentially just a coordinate. Make sure you understand the distinction between the Tour, nodes, and points after reading section 1.


A. The Point Class

The Point class file that represents a point, contained by a node, in a tour. Open it in Codio and study it carefully. The API is as follows:

public class Point
----------------------------------------------------------------------------------------
Point(double x, double y)       // create the Point (x, y)
String toString()               // return String representation
void draw()                    // draw Point using PennDraw
void drawTo(Point that)        // draw line segment between this  
                               // Point and that
double distanceTo(Point that)  // return Euclidean distance 
                               // between this Point and that 

B. The Tour Class

Create a skeleton for your Tour class, which must implement TourInterface:

public interface TourInterface
----------------------------------------------------------------------------------------
String toString()                 //create a String representation 
                                  // of the Tour
void draw(Point p)       // draw the Tour using PennDraw
                         // any edge starting or ending at p 
                         // should be in a distinct color
int size()                      // number of Points in this Tour
double distance()               // return the total distance of the 
                                // Tour
void insertInOrder(Point p)     // insert p at the end of the Tour
void insertNearest(Point p)     // insert p using the nearest        
                                // neighbor heuristic	
void insertSmallest(Point p)    // insert p using the smallest-   
                                // increase heuristic

Write method stubs for each method declaration in the TourInterface interface. The stubs for methods with non-void return types must each return a dummy value so that Tour.java compiles.

Add appropriate header comments and method comments.


C. The Node Class

The Node class we have provided will form the basis of your Tour class’s node sequence structure. Each Node stores a single Point in your Tour’s path and a reference to the next Node in the path. Its API is as follows:

public class Node
--------------------------------------------------------------------------------------
Node(Point p)                // create a Node containing Point p
Node(Node n, Point p)        // create a Node containing Point p and   
                             // with n as its next Node in the list

Declare (do not initialize yet) the following private fields in your Tour class:

When your Tour class’s sequence of nodes is not empty, both head and lastNode must be different instances of the Node class (two different objects) yet each Node must store the same Point object. That is, there will be two different Nodes in memory each of which contains a reference to one common Point in memory. Note that this is different from having each Node refer to distinct Point objects with equivalent values. The purpose of this is to represent the cyclical nature of the salesperson’s route: it begins and ends at the salesperson’s home. This is a required implementation detail.

You may not use Java’s built-in LinkedList class to implement Tour. You should also not write your own class called LinkedList since your Tour class will handle all functionality related to managing nodes. Tour is not a linked list because it does not implement the List ADT.


D. Constructor and toString()

Implement a single constructor for your Tour class that takes no arguments and creates an empty Tour. This means that both head and lastNode will be null.

toString() returns a String representation of the Tour (the first Point should show up at the end as well, just like it does in your sequence of nodes). Call toString() on each Point to get a String representation of the Point. Your output must match this description exactly in order to pass the autograder tests.

If the Tour is empty (has no Nodes), toString() should return the empty String.

Helpful: If you need to iterate over your sequence of nodes without specifically doing anything to it, you can do the following:

Node curr = head;
while (curr.next != null) {
	curr = curr.next;
}

Required Testing: If you haven’t already filled in the test case, complete and run testToStringEmpty(). Running the JUnit should show that this test passes if you’ve implemented the test case and toString() properly.


E. insertInOrder()

To facilitate testing, you will need to implement insertInOrder() so you can add Nodes to your tour.

insertInOrder(Point p) adds a node storing Point p as the “last” node of the Tour.

Remember that your Tour class should always maintain lastNode at the end of the node sequence referring to the same Point p as the first node in the tour.

If the Tour is initially empty, make sure that after this method finishes, your Tour contains two Node objects, both referring to the same Point.

You might find it the iteration method in section 2E to helpful again (although you may need to modify it). You might also find it helpful to write a helper function that, given a point, inserts a new Node after a given Node.

Required Testing: Write a main method in Tour, create a tour, add the 4 points below using insertInOrder(). You’ll be using this tour to test draw() later which doesn’t have any JUnit tests as it’s difficult to check for correct drawings with JUnit.

The following image shows the structure of the linked sequence these insertions should create:

tour

Now call System.out.println on the tour you made, and check that what’s printed matches the following output (including the blank line at the end) by running java Tour in terminal and verify that toString works correctly:

(0.0, 0.0)
(1.0, 0.0)
(1.0, 1.0)
(0.0, 1.0)
(0.0, 0.0)

If you haven’t already done so, complete the remaining toString tests, testToStringOnePoint() and testToStringSquare() in TourTest.

For testToStringOnePoint(), insert a point (0.0 , 0.0) into an empty tour and test what toString() outputs on that tour. The expected correct output should be the string below. Note that \n is a special character that represents a newline and the last newline character is intentional.

String expected = "(0.0, 0.0)\n(0.0, 0.0)\n";

For testToStringSquare() insert the same 4 points as the square tour you created in main of Tour using insertInOrder() and checking that using toString() on the tour gives the correct output. We again have provided the expected correct output:

String expected = "(0.0, 0.0)\n(1.0, 0.0)\n(1.0, 1.0)\n(0.0, 1.0)\n(0.0, 0.0)\n"

If you haven’t done so, run and check that the tests you’ve just completed pass.


F. Utility Methods

Implement the size(), distance(), and draw() methods of Tour. There are many good ways to implement these methods, using for loops, while loops, or recursion. The choice is up to you.

size() returns the number of Points in the Tour, (counting the point in Head and lastNode only once). This is distinct from distance()!

distance() returns the total length of the Tour from Point to Point. Use the distanceTo(Point p) method of a Point to find its distance to p. An empty Tour has a distance of 0.0. This is not the same as the number of points in the Tour.

draw(Point p) draws the entire Tour from Point to Point using functions that call PennDraw code. Both edges adjacent to the input Point p should be drawn in a different color (if p is null, none of the edges should be in a different color). Use the drawTo(Point q) method of a Point to draw a line from it to q. As we have provided VisualizeTour to handle setting up PennDraw’s canvas for drawing your Tour, all this function needs to do is call the drawTo method to draw every line segment between adjacent Points. If an empty Tour calls the draw method, the method should simply return without drawing anything.

The image below shows what our reference draws when we call tour.draw(a) (refer to section E for the value of a). tour is the four-point Tour we created for testing. Notice that the lines for a are colored red.

tour image

Required Testing: Complete and run all tests for size(), distance, and insertInOrder() in TourTest that aren’t filled in. Important: Note that the first line of each .txt file are sizing numbers PennDraw uses, not a point, so make sure to account for that in your tests. There are no tests for draw() as it’s difficult to test that items are drawn correctly on the canvas with PennDraw. However, you should verify that your implmentation of draw() works on the four-point Tour that you created in main in part E by using View Running Program, etc. and checking it matches the image above.

As you debug your code, you may find this Java execution visualizer helpful.


3. Insertion Heuristics


A. Testing with VisualizeTour

The VisualizeTour program included provides a user interface for you to visually test the methods you have written in Tour. Run it with a filename argument (one of the files we provide) in the terminal to animate the construction of your Tour. In the table at the bottom of this page, we have listed the values of size() and distance() that your methods should obtain for each insert method, as well as the PennDraw output that draw() should produce.

Required Testing: Check that your in-order insertion method works for at least the input files tsp0.txt, tsp1.txt, tsp2.txt, tsp3.txt, tsp4.txt, tsp5.txt, tsp8.txt, tsp10.txt, and tsp100.txt. Both the drawing itself, and the size and distance, need to match the reference outputs at the bottom of the page. Since you should have passing test cases for functions that you’ve completed so far, you shouldn’t have too many cases that don’t match the given drawings, sizes, and distances. Do not continue until insertInOrder works for all these cases!


B. insertNearest()

insertNearest(Point p) adds a Node storing the Point p to the Tour after the closest Point (Node) already in the Tour.

If there are multiple closest Points with equal distances to p, insert p after the first such Point in the sequence.

Your method must handle empty tours in the same way that insertInOrder() does when there are no nodes in the sequence.

Required Testing: If you haven’t done so, complete and run the insertNearest() test cases in Tour making sure the cases pass. Important: Again, you should note that the first line of each .txt file are sizing numbers PennDraw uses, not a point, so make sure to account for that in your tests. You should also make sure your VisualizeTour results match the figures below for the Nearest-Neighbor Heuristic for all test cases through tsp100.txt like you did for insertInOrder(). Both the drawing itself, and the size and distance, need to match.


C. insertSmallest()

insertSmallest(Point p) adds a Node storing Point p to the Tour in the position where it would cause the smallest increase in the Tour’s distance.

Do not compute the entire Tour distance for each position of p. Instead, compute the incremental distance: the change in distance from adding p between Points s and t is the sum of the distances from s to p and from p to t, minus the original distance from s to t.

Essentially, for each point p that we add, we want to check what the change in distance would be between points s and t in the tour if we were to add p between them, find where in the tour that change in distance is minimized, and put p at that place.

If there are multiple positions for p that cause the same minimal increase in distance, insert p in the first such position.

Your method must handle empty tours in the same way that insertInOrder() does when there are no nodes in the sequence.

If you wrote a helper function when writing insertInOrder() that inserts a given Point after a given Node, you may find it useful again here.

Comment out all print statements in Tour before running VisualizeTour on a file of more than 100 Points. Otherwise, you will be waiting for a long time for VisualizeTour to finish.

Required Testing: If you haven’t done so, complete and run the incomplete insertSmallest() test cases in Tour making sure the cases pass. Important Reminder that you should note that the first line of each .txt file are sizing numbers PennDraw uses, not a point, so make sure to account for that in your tests. You should also make sure your VisualizeTour results match the figures below for all test cases through tsp100.txt like you did for the other two insertion functions. Both the drawing itself, and the size and distance, need to match.


D. Reference Output

Test your nearest-neighbor heuristic and smallest-increase heuristic methods using VisualizeTour. The following are the values and PennDraw output that your Tour methods should give for each of the provided input files. Note that for the files containing large quantities of points, such as mona-50k.txt, your program may take a long time to build the tour. You may have to wait for several moments, staring at a blank white PennDraw canvas, before your tour is visualized.

File In-Order Insertion('o') Nearest-Neighbor Heuristic('n') Smallest-Increase Heuristic('s')
tsp0.txt Size: 0
Distance: 0.0000
Size: 0
Distance: 0.0000
Size: 0
Distance: 0.0000
tsp1.txt Size: 1
Distance: 0.0000
Size: 1
Distance: 0.0000
Size: 1
Distance: 0.0000
tsp2.txt Size: 2
Distance: 632.46
tour 2
Size: 2
Distance: 632.46
tour 2
Size: 2
Distance: 632.46
tour 2
tsp3.txt Size: 3
Distance: 832.46
tour 3
Size: 3
Distance: 832.46
tour 3
Size: 3
Distance: 832.46
tour 3
tsp4.txt Size: 4
Distance: 963.44
tour 4 in order
Size: 4
Distance: 956.06
tour 4 nearest
Size: 4
Distance: 839.83
tour 4 smallest
tsp5.txt Size: 5
Distance: 2595.1
tour 5 in order
Size: 5
Distance: 2595.1
tour 5 nearest
Size: 5
Distance: 1872.8
tour 5 smallest
tsp8.txt Size: 8
Distance: 3898.9
tour 8 in order
Size: 8
Distance: 3378.8
tour 8 nearest
Size: 8
Distance: 2545.6
tour 8 smallest
tsp10.txt Size: 10
Distance: 2586.7
tour 10 in order
Size: 10
Distance: 1566.1
tour 10 nearest
Size: 10
Distance: 1655.7
tour 10 smallest
tsp100.txt Size: 100
Distance: 25547
tour 100 in order
Size: 100
Distance: 7389.9
tour 100 nearest
Size: 100
Distance: 4887.2
tour 100 smallest
tsp1000.txt Size: 1000
Distance: 3.2769e+05
tour 1000 in order
Size: 1000
Distance: 27869
tour 1000 nearest
Size: 1000
Distance: 17266
tour 1000 smallest
bier127.txt Size: 127
Distance: 21743
bier in order
Size: 127
Distance: 6494.0
bier nearest
Size: 127
Distance: 4536.8
bier smallest
circuit1290.txt Size: 1290
Distance: 4.303e+05
circuit in order
Size: 1290
Distance: 25030
circuit nearest
Size: 1290
Distance: 14596
circuit smallest
germany15112.txt Size: 15112
Distance: 4.2116e+06
germany in order
Size: 15112
Distance: 93119
germany nearest
Size: 15112
Distance: 55754
germany smallest
mona-20k.txt Size: 20000
Distance: 4.9650e+06
mona 20k in order
Size: 20000
Distance: 94894
mona 20k nearest
Size: 20000
Distance: 56334
mona 20k smallest
mona-50k.txt Size: 50000
Distance: 1.2366e+07
mona 50k in order
Size: 50000
Distance: 1.6168e+05
mona 50k nearest
Size: 50000
Distance: 95598
mona 50k smallest
mona-100k.txt Size: 100001
Distance: 2.4795e+07
mona 100k in order
Size: 100001
Distance. 2.6272e+05
mona 100k nearest
Size: 100001
Distance: 1.5472e+05
mona 100k smallest
usa13509.txt Size: 13509
Distance: 3.9108e+06
usa in order
Size: 13509
Distance: 77450
usa nearest
Size: 13509
Distance: 45075
usa smallest

4. Extra Credit


A. Extra Credit

For extra credit, implement a better heuristic in a class TourEC that implements the TourECInterface interface. You are not required to use the Tour or Point classes for your extra credit solution. If you use a modified version of these classes to implement TourEC, include them in your extra.zip; otherwise, your TA may be unable to compile your code.

Be warned that this is a relatively difficult extra credit, although it gives an opportunity to learn a great deal about an extremely important problem. Try to write a TourEC that implements one of the heuristics below.

Here are some heuristics you may choose to implement.

Farthest insertion The farthest insertion heuristic is just like the smallest increase insertion heuristic described in the assignment, except that the Points need not be inserted in the same order as the input. Start with a Tour consisting of the two Points that are farthest apart. Repeat the following:

You will have to store all of the unused Points in an appropriate data structure, until they get inserted into the Tour. If your code takes a long time, your algorithm probably performs approximately n3steps. If you’re careful and clever, this can be improved to n2 steps.

Node interchange local search Run the original greedy heuristic (or any other heuristic). Then, repeat the following:

Writing a function to swap two nodes in a linked sequence of nodes provides great practice. Be careful, it can be a little trickier that you might first expect (e.g., make sure your code handles the case when the two Points occur consecutively in the original Tour).

Edge interchange local search Run the original greedy heuristic (or any other heuristic). Then, repeat the following:

This requires some care, as you will have to reverse the orientation of the links in the original Tour between Nodes 3 and 2. After performing this heuristic, there will be no crossing edges in the Tour, although it need not be optimal.


B. Enrichment


4. Submission


A. Readme

Complete readme_tsp.txt in the same way that you have done for previous assignments.


B. Testing

Double-check to make sure you’ve completed all tests in TourTest.java. Don’t be afraid to add some of your own test cases as well. You should make sure that your tests pass.


C. Submission

Submit Tour.java, readme_tsp.txt, and TourTest.java on Gradescope.

You may also submit a TourEC.java file for extra credit. If your TourEC.java requires any additional files, including a modified Point.java or Tour.java, make sure to submit those as well.


  1. If you want to research this problem, it’s historically been called the Travelling Salesman Problem.